Skip to main content

Style Options

Layout Style

Colors schema

Direction

+254751021020 kenyachem @ gmail.com Search :

Distilled Water

Distilled Water
SKU
RXSOL-15-1104-005
SUPPLY LOCATION:
Locations

Distilled Water Battery grade manufacturer and supplier in Mumbai, Gandhidham, Visakhapatnam, Chennai, Ennore, Kolkata, Fujairah, Dubai, Sharjah, Abudhabi.

Variations

Distilled Water, Battery Distilled Water, Windshield Wiper Fluid, Distilled Water For Home, Industrial Water, SPA & Saloon Distilled Water, Radiator Coolant Water, Laboratory Water, Medicated Water, Aquarium Water and Saloon Distilled Water.

Note
GENERAL :
In order to ensure safety , it is essential to operate and maintain your batteries in accordance with the recommendations in this booklet.
a). ACID : Batteries contain dilute sulphuric acid which is poisonous and corrosive. It can cause burns on contact with skin and eyes. If acid is split on skin or clothing, wash plenty of clean water. If acid gets in to the eyes wash well with plenty of clean water and get IMMEDIATE MEDICAL ATTENTION.

b)GASES : Batteries can give off explosive gases. Keep sparks, flames and lighted cigarettes away from battery and battery room. Ensure connections are tight before switching on, using only insulated tools. Areas where batteries are kept or charged must be adequately ventilated.

c).ELECTRICITY :
Use only insulated tools to make connections to a battery. Check the circuit to ensure it is safe before making a connection to the battery. Before working on a battery , always remove personal metal effects, such as rings, watches, bracelets, necklaces, etc.
ALWAYS PROTECT THE EYES.

e)
ERECTION : Erection and commissioning of batteries to be done in accordance with separate instructions provided by manufacturer
.
FLOATING BATTERY SYSTEMS : In a floating battery installation the charger , battery and load are connected in parallel. The charger supplies the load current continuously whilst the battery remains in a charged condition, immediately capable of supplying the load should the main supply be interrupted.

CONDENSED INSTRUCTIONS
Top up all cells regularly with distilled or deionised water.
Keep the electrolyte level between the red and green mark, preferably near the green mark, etched on the transparent level indicator
.
If,before topping-up, the electrolyte level had fallen below the red mark, it is advisable to give the battery acharge for approximately ½ hour above 2.3 volts per cell after addition of battery grade distilled water in order to mix the electrolyte. Keep battery and surroundings clean and dry
.
Ensure bolted connections are tight. Keep connectors, pillars and bolted connections covered with petroleum jelly for protection against corrosion.
Take every precaution to avoid risk of explosion of gases particularly during charge.
Never smoke or use a naked flame near the battery, or in the battery room or take any action which could cause an electric spark.
Ensure that charging equipment maintains the battery at the correct voltage.
Examine all cells at regular intervals.
Action should be taken to restore any “out of step” cells to a fully charged condition.
The room in which the battery is housed should be well ventilated and its temperature as moderate as the climate will allow
.
The temperature of electrolyte should preferably never exceed 380C
 
FLOATING
The method of operation known as “floating” means that the charger, the battery and the load are connected in parallel.
The battery should be held constant at a voltage between 2.23 to 2.27 volts per cell, so that the battery will normally be maintained in a fully charged condition. The voltage to be maintained based on the ambient temperature as detailed in TableI.
 
Temperature Float Voltage
<5 deg. C 2.270.02 vpc
200C to 350C

2.250.02 vpc

360C to 450C
2.230.02vpc
TABLE-I
The charger on a floating system should have a current rating sufficiently high to ensure that the battery does not become discharged during prolonged periods of operation. The current rating of the charger should be higher than the normal continuous loads of the system, so that the battery only supplies the short duration peak loads when the current required is greater than the
charger output. The voltage output of the charger may be regulated either automatically, or manually .The automatic type of constant voltage charger will maintain the pre-set steady voltage indefinitely, if used within its rated output. With the manual type of charger, however, care should be taken to keep the voltage level correct at all times, particularly if loads vary appreciably
, by adjustment of the voltage control.

BOOST CHARGING
The battery should be recharged as soon as possible after any discharge, amounting to more than 5 to 10% of the rated capacity of the cells. A reference to the specific gravity of electrolyte in the pilot cell will indicate when a charge should be given. Should the fall in gravity of the pilot cell from the normal fully charged value, be greater than the allowable specific gravity drop, then the battery should receive a boost charge.
Operate the charger in accordance with the separate charger instruction, so as to supplya charge current to the battery. The initial “starting rate” charging current can be any value up to two times the “finishing rate” of charge, as given in the Appendix. The voltage of the battery will rise as the battery becomes charged. When the battery voltage reaches a value equivalent to 2.36 volts per cell, the charge current should be limited to a maximum of the “finishing rate” of charge. Where automatically regulated charges are employed, the charge current may not be under manual control, but the current output of such charges should not greatly exceed the finishing rate of charge, when the cells are gassing. Charging should be continued, taking specific gravity and voltage readings on the pilot cell, at half hourly intervals, until the readings become sensibly constant over a period of 2 hour
.
After the charging is over, the specific gravity of electrolyte has to be adjusted, if required, to a value indicated by the manufacturer by addition of demineralised water only. Use well calibrated hydrometer for the purpose of specific gravity measurement with a tolerance of +/- 0.005 points. Never use acid for level adjustment of cells. The type of charger and the controls provided on it, will determine the procedure to be carried out in order to charge the battery. The manufacturer's charger instructions should be referred to if in doubt

PILOT CELL ::: Select one cell of the battery as a 'pilot cell. For batteries containing more than 60 cells, select one pilot cell
for each 60 cells. Any variations in specific gravity of the electrolyte in the 'pilot' cell(s) will be indicative of the state of charge
of the whole battery. Keep the electrolyte level between the red and green mark, preferably near the green mark, etched on the
transparent level indicator by adding distilled or deionised water when required. After topping up,
it is preferable to give the battery a charge for approximately ½ hour, above 2.3 volts per cell. This will mix the electrolyte and
prevent water from stratifying at the upper level.

5.GENERAL INFORMATION
1. Specific gravity: The specific gravity of the electrolyte in fully charged cells should be 1.200+/-0.005 at 270 C. During the course of years there may be a slight fall in the maximum specific gravity values obtainable at end of charge, but acid should never be added except on the recommendations of the manufacturer.
2.Topping up Due to evaporation, and gassing on charge, water is lost from the electrolyte, and the level gradually falls.
Water must be added at intervals to bring the electrolyte to the correct level. Do not allow the levels to fall below the red mark.
The water used for this topping-up operation must be pure and should be demineralised and conforming to IS 1069 Never use metal vessels for storing or dispensing the topping-up water.
Water should preferably be added below the surface of the electrolyte, by use of a rubber syringe or plastic funnel. This helps to mix the water with the electrolyte. It will also help to assist mixing by having the battery on charge, with all cells gassing, either during, or soon after topping-up.
3.Preservation Keep the battery and surrounding clean and dry.
Wipe down the cells with a clean soft cloth dampened with clean water, if necessary, a small amount of mild detergent may be added to the cleaning water to remove any greasy film. Ensure bolted connections are tight. Keep connectors, pillars and bolted connections covered with petroleum jelly for protection against corrosion. Should any corrosion of the connectors occur because of spilt acid etc. carefully remove corrosion products, thoroughly clean and neutralize with alkali solution or dilute ammonia.
Dry the affected parts and liberally coat with petroleum jelly to protect from further corrosion. Care should be taken to ensure that the neutralizing solution does not enter the cell.
4.Temperature correction The specific gravity of the electrolyte varies with temperature. Any reading observed on the hydrometer should therefore be corrected as follows: For every 100 , above 150 C, add 7 point (0.007 specific gravity) to the specific gravity as read on the hydrometer
Similarly, for each 100 C, below 150 C, subtract 7 point (0.007 specific gravity) as read on the hydrometer
 

The products that we manufacture and supply are as per the  following standards:

  • Indian Standard (IS) 1069, 1070, 7029
  • International Standards Organisation (ISO) 3696 grade 1, 2, 3
  • American Standards- A.S.T.M D-1193 grade & types 1,2,3,4

Different grades and types of distilled water offered by us is formulated employing highly advanced cold process technology.

Commercial Distilled Water: 

  • Distilled Water 3 in 1 ( Distilled Water 3 In 1 can be used in:::-
     For top up in inverter and all types of batteries
    Add with coolant in radiator (as per ratio recommended)
    Add in wiper tank of a car for cleaning windshield
  • Aquarium Water
  • Battery Distilled Water
  • Windshield Wiper Water
  • Distilled Water For Home
  • Industrial Water
  • Distilled water for Pathology Laboratory
  • Radiator Coolant Water
  • SPA & Saloon Distilled Water

MAINTENANCE SCHEDULE ::: The maintenance schedule given here is divided in daily, weekly, monthly and yearly maintenance. The actions to be taken, checks and recording required are given herewith.
A.DAILY MAINTENANCE
1. A daily general maintenance should include a check and record of the following :
2. Overall float voltage measured at the battery terminals
3.Charger output current and voltage
4.Specific gravity, voltage and temperature of pilot cells.

B.WEEKLY MAINTENANCE
A weekly maintenance should include all the items mentioned in “daily maintenance” and the following :
1. Check electrolyte level of all cells and if required, top-up with battery grade water conforming to IS 1069. Never use metal vessels for topping up because of the risk of electrolyte continuation and accidental short circuit.
2. Visually check the conditions of each cell and battery bank. If abnormal or very high amount of sulphation on the terminals or connectors are observed, take immediate action in removing them.
3.Visually check the cleanliness of battery, battery stands and battery room area for accessibility, cell integrity and acid leakage.

C.MONTHLY MAINTENANCE
1. A monthly maintenance shall include all checks listed under “daily” and “weekly” maintenance schedule and also the following:
2.Check and record specific gravity, voltage and temperature of all cells in the battery bank.
3.Adjustment of specific gravity by addition of battery grade water is to be done only after charging and under skilled supervision (Never use acid for this purpose unless specifically suggested by manufacturer). After adjustment of specific gravity, charge the battery at a voltage around 2.4 volts per cell for a period of 2 hours for mixing of the electrolyte properly.

D.QUARTERLY MAINTENANCE
A quarterly maintenance shall include all checks listed under “daily”, “weekly” and “monthly” maintenance schedule and also the following :
1. Check and record specific gravity, voltage and temperature of all cells in the battery bank.
2.If the specific gravity of most of the cells are found to be lagging by an average of 10 to 15 points, the battery bank would call for an equalizing charge at a current equivalent to 3% - 5% of its rated value for 6-10 hours to restore the state of charge to full..
3.The temperature of the electrolyte normally is higher than the ambient. But for a bank, unless it has undergone a discharge within previous 24 hours, the electrolyte temperature should lie within 3
5 deg. C higher than the corresponding ambient temperature. In case of a deviation from this range, the charger needs to be checked for its quality of power output in terms of the ripple contents in the charging voltage and current. Corrective action should be immediately taken to avoid any deterioration in the battery bank due to this anomaly

E.HALF YEARLY MAINTENANCE
A half yearly maintenance shall include all checks listed under “daily”, “weekly”, “monthly” and “quarterly”
maintenance schedule and also the following :
1.Remove all corrosion product and clean connector thoroughly. Use enough amount of petroleum jelly on the connectors to prevent farther corrosion and put back shrouds in place.
2. Check the tightness of fasteners on inter-cell, inter-row and inter-tier connections to prescribed torque values as suggested by manufacturer. If required, tighten the connections to the required torque value .

F.YEARLY MAINTENANCE
A yearly maintenance should include all items listed under 'daily', 'weekly' and 'monthly' maintenance schedule and also the following : Discharge the battery at C10 current for 10 hours followed by a constant current recharge.
The charging to start at the “starting rate” as mentioned in the product catalogue for the respective size till the cell voltage
reached 2.36 volts per cell followed by charging at “finishing rate” pertaining to the specific size of the battery as mentioned in manufacturer's catalogue. The charging to be stopped when the cell voltage and specific gravity readings are constant for four consecutive half hourly readings. The expected end-of-charge voltage is of the order of 2.7 2.75 volts per cell.
During charging it has to be ensured that a minimum Ah input of 125% of the previous discharged Ah is administered to the battery.
The temperature during charging should not increase beyond 450 C. In such cases, the charging to be stopped and the cells to be allowed to cool down till 400 C when the charging can be resumed. The timings are to be noted so that the duration of charge can be compensated accordingly to ensure that the minimum Ah input requirement is fulfilled. After the charging is over, gravity and level adjustments are to be carried out after a rest of 4 hour.
The battery bank, then, is to be given an equalisation charge at a current equivalent to 3% - 5% of rated C10 capacity for 12-24 hrs. The battery bank can be given back to the system after the equalising charge is over
.

 

X

Request for Quote and Get Heavy Discount on Price